亚洲美女高潮久久久久-久久久久成人精品无码-久久久精品人妻一区二区三区四-无码人妻aⅴ一区二区三区

position: EnglishChannel  > Case> Qinghai's Efforts to Achieve Zero-carbon Goal

Qinghai's Efforts to Achieve Zero-carbon Goal

Source: Science and Technology Daily | 2023-06-08 09:30:00 | Author: ZHANG?Yun?&?CHEN?Chunyou


A?view?of?the?110 kV Guyi Substation at?the?Qinghai Zero-carbon Industrial Park.?(Photo?by?Li?Yongpeng/For?S&T?Daily)

By?ZHANG?Yun?&?CHEN?Chunyou

In 2021, Qinghai province decided to build a zero-carbon industrial park with Pingbei Economic Zone in Haidong city as the pilot area, which has paved the way for the sustainable development of its new energy industry.

With an area of 22.09 square kilometers, the Qinghai Zero-carbon Industrial Park plans to form three industrial clusters, namely lithium battery, new energy equipment and animal husbandry, and build related service industries to support the development of these low-carbon industries.

In the computer room of China Telecom (National) Digital Qinghai New Big Data Center, based in the park, rows of standard cabinets provide cloud network services, such as equipment hosting and Internet access for enterprises across Qinghai province and beyond.

Having an estimated investment of one billion RMB and covering an area of 100 mu (6.67 hectares), the center is home to 9,000 standard cabinets. Its operation further strengthens the park's ability to offer digital services and develop digital economies.

Relying on Qinghai's advantages in developing the clean energy industry, the carbon emissions from the whole life cycle of the park, such as construction, operation, maintenance and demolition, could be reduced by building a closed-loop control system of "net zero carbon" and the supply system of "all green electricity".

Now, industrial energy consumption accounts for more than 70 percent of Qinghai's total energy consumption, making the control and reduction of carbon emissions from all types of industrial parks a viable path to low-carbon development.

The first 110 kV green electricity demonstration project, 110 kV Guyi Substation in this park began on November 27, 2021, and was put into operation on December 27, 2022. It has further optimized the 110 kV grid structure of the park, and improved the reliability and quality of power supply. It is expected to produce 700 million to one billion kWh of green electricity for the park annually, meeting its new load power demand.

To offer a stable 24/7 supply of electricity, the digital twin technology was also used in Guyi substation to reduce energy consumption.

This project recently realized intelligent holographic sensing, which is a breakthrough in transforming the operation and maintenance management of the substation from a traditional mode, to an intensive and digital one.

Editor:陳春有

Top News

  • On September 9, the Changtai Yangtze River Bridge — the world's longest cable-stayed bridge — officially opened to traffic. Spanning 10.03 kilometers across the river, the bridge integrates expressway, intercity railway and ordinary highway functions. It reportedly holds six world records, including being the longest span cable-stayed bridge.

CIFTIS Puts Cooperation on Fast Track

Held in Beijing's Shougang Park, a transformed industrial area, this year's CIFTIS, as always, is a grand international gathering, with more than 80 countries and international organizations exhibiting or holding events.

Qingdao Emerges as Livable International City

Qingdao, a major port city in Shandong province in east China by the Yellow Sea, is rapidly emerging as a hub of internationalization, innovation and quality life.

抱歉,您使用的瀏覽器版本過低或開啟了瀏覽器兼容模式,這會(huì)影響您正常瀏覽本網(wǎng)頁

您可以進(jìn)行以下操作:

1.將瀏覽器切換回極速模式

2.點(diǎn)擊下面圖標(biāo)升級(jí)或更換您的瀏覽器

3.暫不升級(jí),繼續(xù)瀏覽

繼續(xù)瀏覽